Industry · Distribution

Testing solutions for distribution networks and utilities

SUDHARSAN helps DISCOMs and cable contractors keep 11 kV and 33 kV networks reliable. We supply relay test kits for feeder panels, primary injection for ring-main units, hi-pot for underground cables and 3-phase sources for meter labs. When a feeder faults, the fault is cleared and does not spread, and every meter bills correctly.

  • 11 / 33 kV feeders
  • RMU primary injection
  • Meter labs
What we solve

Outcomes for every role on the job

DISCOM engineer

Feeder faults cleared, not spread.

Meter lab

Accurate meters and correct bills.

Cable contractor

Cables proven before backfilling.

Consumer

Fewer outages.

Test-point explorer

Where we test in your network

Pick a test to see where it is done and which SUDHARSAN kit proves it.

SUDHARSAN SI/CV-100 relay test kit used for over-current and earth-fault relays
Test point 1 · Over-current and earth-fault relays

SI/CV-100

Relay test kit

Where
11 / 33 kV feeder protection panels
Rating
0.01–100 A
View the SI/CV-100 →
View all test points as a table
TestWhere in the networkSUDHARSAN kit
Over-current and earth-fault relays11 / 33 kV feeder protection panelsSI/CV-100: 0.01–100 A
Primary injectionRMUs and 11 kV breaker panelsSI/PIK-10T: SI/PIK-10: 500–2000 A
CT ratio and polarityFeeder and metering CTsSI/LTR-10: 500–2500 A
Cable insulation withstand11 kV and 33 kV underground cablesSI/EHV-70/80: To 100 kV AC / 120 kV DC
3-phase relays and energy metersMeter labs and HT metering panelsSI/3P-CV: 0–470 V, 50 A per phase
CT and PT polarityMetering CTs and PTsSI/CT-PT: Go / no-go polarity check
FAQ

Frequently asked questions

How is an 11 kV feeder relay tested?

Isolate the relay CT inputs, inject current from a secondary injection kit such as the SI/CV-100 to find pick-up, then inject 2×, 5× and 10× the setting and time the trip against the set curve.

Can a 33 kV cable be hi-pot tested on site?

Yes. With the cable disconnected and its screen earthed, the SI/EHV-70/80 applies the specified AC or DC test voltage for the specified time. A healthy cable holds with steady or falling leakage.

How do we check energy-meter accuracy?

Feed known 3-phase voltages and currents from the SI/3P-CV and compare the meter's registration with the input. A class 1 meter must be within ±1 %.

Trusted in distribution by
  • Tamil Nadu State Electricity Board
  • Larsen & Toubro
  • ABB

Equipping a test team or meter lab?

Tell us your feeders and cable ratings, and we will recommend the set.

Tell us your application. We’ll engineer the test solution. · Technical: +91 98847 01185 · anirudh@sudharsanelektric.com

WhatsApp +91 96558 62424
Other industries

IEC standards are cited for the test method only. SUDHARSAN kits follow that method; they are not certified to the standard.

Fill in the Information to download our brochure

Fill in the Information for product related