Industry · Power generation

Testing and commissioning solutions for power plants

SUDHARSAN builds the test systems power plants use to prove every CT, relay, breaker and DC control circuit before a unit is synchronised and after every shutdown. One kit per test, from generator CT ratio at 4000 A to station-battery trip coils, all built and tested at our works in Chennai.

  • 4000 A CT testing
  • 10 kV knee-point
  • DC trip coils
What we solve

Outcomes for every role on the job

Plant manager

Fewer forced outages, and units restart on time after a shutdown.

Testing engineer

One purpose-built kit for each test: CT, relay, breaker, DC circuit.

Safety officer

Protection proven to trip before a fault spreads.

Purchase

Rugged kits built in India, with spares and service from Chennai.

Test-point explorer

Where we test in your plant

Pick a test to see where it is done and which SUDHARSAN kit proves it.

SUDHARSAN SI/LTR-20 loading transformer used for ct ratio and polarity
Test point 1 · CT ratio and polarity

SI/LTR-20

Loading transformer

Where
Generator and generator-transformer CTs
Rating
3000 A / 5 V or 4000 A / 4 V
View the SI/LTR-20 →
View all test points as a table
TestWhere in the plantSUDHARSAN kit
CT ratio and polarityGenerator and generator-transformer CTsSI/LTR-20: 3000 A / 5 V or 4000 A / 4 V
CT knee-point voltageGenerator differential and REF coresSI/KPV: SI/KPV-HV7: 0–10 kV AC
Over-current and earth-fault relaysGenerator, transformer and feeder panelsSI/CV-200: 0.01–200 A, timer, aux AC/DC
Primary injection of LT breakersStation ACBs and MCCBsSI/PIK-10T: SI/PIK-10: 500–2000 A
Contact and joint resistanceGenerator breakers, isolated phase busSI/MVD-100: 100 A DC
DC trip and closing coilsBattery-fed breaker controlsDC 300 V source: 0–300 V DC variable
FAQ

Frequently asked questions

What equipment tests a generator CT at full current?

A loading transformer such as the SI/LTR-20 pushes 3000–4000 A through the CT primary from a single-phase supply. You then read the secondary current and confirm the ratio against the nameplate.

How do you check a protection CT's knee point?

Keep the primary open, apply rising voltage to the secondary with an SI/KPV unit, and plot V against I. The knee is where +10 % voltage gives +50 % current. It must sit at or above the nameplate Vk.

Can SUDHARSAN build a kit for a non-standard rating?

Yes. Every system is built in-house and can be made to your current, voltage and duty cycle. It is tested at 20–100 % of rating before dispatch.

Trusted in power generation by
  • Neyveli Lignite Corporation
  • Adani Power (Maharashtra)
  • Tamil Nadu State Electricity Board
  • Alstom

Need this for your plant?

Send us the equipment you test and we will recommend the model and rating.

Tell us your application. We’ll engineer the test solution. · Technical: +91 98847 01185 · anirudh@sudharsanelektric.com

WhatsApp +91 96558 62424
Other industries

IEC standards are cited for the test method only. SUDHARSAN kits follow that method; they are not certified to the standard.

Fill in the Information to download our brochure

Fill in the Information for product related