- +91 96558 62424
- anirudh@sudharsanelektric.com
- Since 1982
SUDHARSAN builds the test systems power plants use to prove every CT, relay, breaker and DC control circuit before a unit is synchronised and after every shutdown. One kit per test, from generator CT ratio at 4000 A to station-battery trip coils, all built and tested at our works in Chennai.
Fewer forced outages, and units restart on time after a shutdown.
One purpose-built kit for each test: CT, relay, breaker, DC circuit.
Protection proven to trip before a fault spreads.
Rugged kits built in India, with spares and service from Chennai.
Pick a test to see where it is done and which SUDHARSAN kit proves it.

Loading transformer

CT knee-point tester

Relay test kit

Primary injection kit

Micro-ohm meter

Variable DC source
| Test | Where in the plant | SUDHARSAN kit |
|---|---|---|
| CT ratio and polarity | Generator and generator-transformer CTs | SI/LTR-20: 3000 A / 5 V or 4000 A / 4 V |
| CT knee-point voltage | Generator differential and REF cores | SI/KPV: SI/KPV-HV7: 0–10 kV AC |
| Over-current and earth-fault relays | Generator, transformer and feeder panels | SI/CV-200: 0.01–200 A, timer, aux AC/DC |
| Primary injection of LT breakers | Station ACBs and MCCBs | SI/PIK-10T: SI/PIK-10: 500–2000 A |
| Contact and joint resistance | Generator breakers, isolated phase bus | SI/MVD-100: 100 A DC |
| DC trip and closing coils | Battery-fed breaker controls | DC 300 V source: 0–300 V DC variable |
Every system is built in-house and tested at 20–100 % of its rating before dispatch. Non-standard ratings are built to order.
SI/LTR-20Loading transformer · CT ratio & polarity to 4000 A
SI/KPVCT knee-point tester · 0–10 kV AC magnetisation
SI/CV-200Relay test kit · 0.01–200 A, timer, aux AC/DC
SI/PIK-10TPrimary injection kit · 500–2000 A with timer
SI/MVD-100Micro-ohm meter · 100 A DC contact resistance
DC 300 V sourceVariable DC source · Trip & closing coilsA loading transformer such as the SI/LTR-20 pushes 3000–4000 A through the CT primary from a single-phase supply. You then read the secondary current and confirm the ratio against the nameplate.
Keep the primary open, apply rising voltage to the secondary with an SI/KPV unit, and plot V against I. The knee is where +10 % voltage gives +50 % current. It must sit at or above the nameplate Vk.
Yes. Every system is built in-house and can be made to your current, voltage and duty cycle. It is tested at 20–100 % of rating before dispatch.
Send us the equipment you test and we will recommend the model and rating.
Tell us your application. We’ll engineer the test solution. · Technical: +91 98847 01185 · anirudh@sudharsanelektric.com
IEC standards are cited for the test method only. SUDHARSAN kits follow that method; they are not certified to the standard.